Subsoil Auctions: Valuing a Lot Before the Bid
Filing an auction application takes a day. Working out what a lot is actually worth — and where your walk-away price sits — is a different order of problem. Here's how Russian subsoil auctions actually play out, with real numbers, and how to set a ceiling bid before the steps start.
Valuing a subsoil auction lot before the bid means calculating reserves by analogy, a production profile and NPV in advance, then converting them into one number — your walk-away price for the one-time payment. Above that number, bidding stops making economic sense, no matter how many steps your competitors take.
How Do Rosnedra Auctions Work?
An auction for the right to use a subsoil plot is the main route to a new oil and gas license in Russia. The winning criterion is set by Article 13.1 of Russia's Subsoil Law, and the whole procedure — from application to the results protocol — runs on an electronic trading platform.
"The criterion for determining the winner of an auction is the highest amount of the one-time subsoil-use payment offered." — ConsultantPlus — Russian Subsoil Law, Art. 13.1 (in Russian)
Russian legal entities and individual entrepreneurs registered in Russia can take part. Before filing, a participant transfers a deposit and a participation fee — the amounts and details are set by that specific auction's terms, and the lot notice is published well in advance.
"Before submitting a bid, a person wishing to take part in the auction transfers a deposit and a participation fee, in the amount and to the details set out in the auction's terms and conditions." — Rosnedra — organizing subsoil auctions (in Russian)
- Rosnedra publishes the auction terms and the starting one-time payment — at least 45 days before the auction.
- A participant pays the deposit and fee, then files through the electronic trading platform.
- On auction day, participants raise the one-time payment step by step — the highest bid wins.
- The winner pays the final one-time payment plus the state fee for the license.
What Does Participation Cost, and What Is the One-Time Payment?
The deposit and participation fee are the price of a seat in the room, not a price on the asset itself — they confirm you're a serious bidder and cover the auction's running costs. The real price of the lot is the one-time subsoil-use payment, set during the bidding itself, and it can run far past the starting number.
The spread can be enormous. In a real auction for the Sobolokh subsoil block in Yakutia, the starting one-time payment was 2.649 million rubles — the winner walked away with the license for 209.779 million rubles, after 169 bidding steps.
"Sobolokh: a one-time payment of 209.779 million rubles against a starting price of 2.649 million rubles, 169 auction steps. The company drove the starting price up 79-fold." — Neftegaz.RU — Yakutia gas-block auctions (in Russian)
Not every announced auction ends with a winner, either. Russia held 183 subsoil-use auctions in 2025 — only 110 of them found a winner.
"…at 183 auctions, the right of use was granted for 110 plots, which already amounts to 60.1%." — ANGI — 2025 subsoil auction statistics (in Russian)
How Do You Value a Lot Before Bidding?
Before filing, there's one practical question to answer: what is this license actually worth to you — not what the auction organizer is asking for it. The starting point is the category and volume of reserves: proved (A, B, C1) or forecast (C2, P1–P3). That decision drives which valuation method even applies.
"If a company were operating with current reserves and production data, the income approach would be preferable for valuing the license. But under mothballed, non-operating conditions, the comparative approach is the only reliable way to determine market value." — RBC Companies — valuing a subsoil-use license (in Russian)
The problem: a plot up for auction usually hasn't been developed yet, so there's no operating data of your own to lean on — and open data on past license-deal prices in Russia is thin. That makes a defensible set of analogs and a probabilistic reserves estimate worth more than a single number from someone else's deck. The minimum input set for a bid decision:
- Geological parameters and reserves volume by category
- Analogs — neighboring fields with similar geology and development history
- Production profile and economics (NPV, IRR) across oil and gas price scenarios
- The upper bound on the one-time payment at which the lot still pays back
What Are the Risks for the Winner?
The main risk is overpaying. The Sobolokh example above shows how competitive bidding can drive the one-time payment tens of times above the starting price. The winner isn't whoever wants the asset most — it's whoever reaches the ceiling last, and there's no guarantee that ceiling still makes economic sense.
There's a flip side, too: if the winner doesn't pay the final one-time payment on time, Article 13.1 of the Subsoil Law hands the win to the bidder with the next-highest offer — whoever came second. The original winner simply loses the license for that lot, along with the time and cost of bidding.
Finally, there's the risk of no competition showing up at all. An auction for the Zapadno-Kypakynsky subsoil block, with a starting one-time payment of 16.68 million rubles, was declared invalid — no bids were received. That's not a rare outcome: nearly 40% of Russia's 2025 subsoil auctions found no winner.
"…16,683,765 … rubles. No bids were received. … The auction was declared invalid." — Rosnedra (Ural district) — Zapadno-Kypakynsky auction results (in Russian)
How Does AVP AI Run the Numbers?
The one tool that actually matters at the auction is not instinct — it's a walk-away price, calculated before the bidding starts. AVP AI — an AI platform for oil and gas asset evaluation — builds that number from the same data a geologist and an economist would need by hand, in minutes instead of weeks.
Given coordinates or a license number, the platform pulls the plot's geology from open industry data, estimates reserves by analogy across a probabilistic P90/P50/P10 range, builds a production profile and a surface-facilities layout, and runs the economics — NPV, IRR — across several price scenarios. The output is a report with a value range for the asset and a defensible ceiling bid, not a single number you just have to trust.
If your shortlist runs to a dozen lots rather than one, it's worth running them through license area screening first — the platform ranks the list under one methodology and shows where a detailed valuation is actually worth the time. And once you've won, the same pipeline carries into oil and gas asset due diligence — now with the real license terms in hand.
Frequently Asked Questions on Subsoil Auctions
The deposit and participation fee are the price of a seat at the auction — paid before you file, and not the final price of the asset. The final one-time payment is what the winner actually pays: it's set during the bidding itself and can run tens of times above the lot's starting price.
Under Article 13.1 of Russia's Subsoil Law, the win passes to the bidder with the next-highest offer — whoever came second. The original winner simply loses the license for that lot.
Substantially. In a real auction for the Sobolokh subsoil block in Yakutia, the starting one-time payment of 2.649 million rubles rose to 209.779 million — a 79-fold increase over 169 bidding steps. The starting price is a poor guide; you need your own walk-away price calculated in advance.
Given a license number or coordinates, the platform estimates reserves by analogy (P90/P50/P10), builds a production profile and NPV, and converts them into a walk-away price for the one-time payment — the ceiling above which bidding stops making economic sense.
Sources
- Official source Rosnedra ↗ Organizing subsoil-use auctions (in Russian)
- Legal document ConsultantPlus ↗ Russian Subsoil Law, Article 13.1: Auctions for subsoil-use rights (in Russian)
- Official source Rosnedra (Ural district) ↗ Zapadno-Kypakynsky auction results (in Russian)
- Industry media Neftegaz.RU ↗ Five subsoil blocks auctioned in Yakutia: Gazprom wins most, YATEC takes one (in Russian)
- Industry media ANGI ↗ Share of successfully completed subsoil auctions rose in Russia in 2025 (in Russian)
- Industry media RBC Companies ↗ How to value a mineral-extraction license (in Russian)
We will value an auction lot for you — free of charge
Give us a license number or coordinates — we will pull the geology, estimate reserves, build a production profile and NPV. Get your walk-away price before the bid deadline.